Cubic Engineering does all the survey and geology study at the destination location then analyze the date and prepare the study to be reported to Cubic construction department and starting the drilling based on the reliable information. Cubic has long term experience in drilling water wells throughout KRI.

 

#WW Name  ClientLocationYearDepth(M)Productivity
1Nogharan1ORYXDemir Dagh-Erbil201227535 m3/h
2Nogharan2ORYXDemir Dagh-Erbil201225536 m3/h
3Nogharan3ORYXDemir Dagh-Erbil201225033 m3/h
4Nogharan4ORYXDemir Dagh-Erbil201425044.8 m3/h
5Nogharan5ORYXDemir Dagh-Erbil201425031 m3/h
6AASORYXA’an Safra- Duhok201310020 m3/h
7Malla Omar1ORYXBanan -Erbil201323024.5 m3/h
8Malla Omar2ORYXBanan -Erbil201326039 m3/h
9Tarrash1ORYXZeg-Erbil201320050.1 m3/h
10Tarrash2ORYXZeg-Erbil201320070 m3/h
11Rovi#1ChveronRovi-Duhok201320072 m3/h
12Rovi#2ChveronRovi-Duhok201319570 m3/h
13Shakrouk1HESSShakrouk-Erbil201325025 m3/h
14Shakrouk2HESSShakrouk-Erbil201330023 m3/h
15Shakrouk3HESSShakrouk-Erbil201320022 m3/h
16Shakrouk4HESSShakrouk-Erbil201325025 m3/h
17TLSSALPDemir Dagh-Erbil201550
18EPFSALPDemir Dagh-Erbil201550
19MarzanMarathonMirawa-Erbil20156240 m3/h
20TangabirMarathonMirawa-Erbil20158148 m3/h
21JisikMarathonJisik-Erbil20147070 m3/h
22HarirMarathonHarir-Erbil201327535 m3/h
23HarirMarathonHarir-Erbil201325036 m3/h
24HarirMarathonHarir-Erbil201327028 m3/h
25HarirMarathonHarir-Erbil201426030 m3/h
26HarirMarathonHarir-Erbil201427536 m3/h
27Safin1MarathonSafin-Erbil201327034 m3/h
28Safin2MarathonSafin-Erbil201325030 m3/h
29Safin3MarathonSafin-Erbil201327534 m3/h

 

Cubic provides many test types based on the newest technologies to determine the productivity of the water wells.

  • Step drawdown test
  • Long term constant rat test.
  • Recovery test
  • Static & Dynamic level test.
  • Chemical test