Spare Parts, Building Materials, Electric and Electronics Items, Heavy Machines, Pipe fittings, Lubricants, Tyre, Vehicles, Stationary, Wood and Lumber, Kitchen and Home Equipment, Fire and Safety Equipment, Paints and Other Construction Chemicals
Supply Chain (Procurement and Logistics) and Subcontracts Management
Supply best brands in a shorter time is our objective, and we depend on relable brands and supplier based on our long history in industry, construction, and trading.
Supply of goods: Spare Parts, Building Materials, Electric and Electronics Items, Heavy Machines, Pipe fittings, Lubricants, Tyre, Stationary, Wood and Lumber, Kitchen and home equipments, Fire and Safety equipments, Paints and other construction chemicals etc.
Project Description
Client: TAQA
Location: ATRUSH
Year Completed: 2019
Type: Water provide solution/Pipeline
The Challenges
There are numerous challenges facing any project. Some are new to the industry, and some are centuries old. Many of these challenges are a direct result of operations, while others a result of indirect, peripheral activities. A surprising number of challenges are not construction issues but must be addressed and managed by Cubic engineering Co. to ensure project success.
Some of the construction/Operation issues include workforce considerations, safety, time constraints, and the changing nature of the work. Non-construction challenges that CE face that are part of the business landscape include legal issues, government regulations, environmental concerns, and socio-political pressures.Cubic Engineering used to overcome on this challenges always.
Provide mobile lightening services (tower lights)
We offer all our customers the option of customising each of our products like mobile lighting towers, lighting accessories etc to specifically meet their requirements and obtain the most benefit at the best possible cost.
These light towers are specifically built to be the best at providing light,
with the lowest fuel consumption, lowest service cost and smallest machine footprint. Inspite of this narrow focus we offer our customers the ability to tweak the specs of the light tower to ensure perfect fit to the requirement.
Our available model of light towers is a specific mobile lighting tower built for the highly demanding specs of the Iraqi oil fields market.
This light tower is the ultimate in setting standards for durability,
ease of operation and aesthetics. As with all our lighting tower models, this can be customized to ensure proper site requirement-machine fit.
- Rental of 4×4 Toyota Land Cruiser Station and Pick-ups fully equipped for difficult areas trips
- Our Cars are equipped with double spare wheels, air compressor, roll over bars, extinguisher, sand rail, first aid kit, cargo fixing nets.
- They can be made available with Driver certified for difficult areas and defensive driving or without driver depending on the rental period.
- Provide vehicles for exploring, drilling, operations, and maintenance projects
We provide under these services mainly specialised and experienced personnel to assist and help our customers in their operations of exploration and production, the following are our main field of expertise:
- Logistics Expert and Logistics Operations Personnel.
- Production Expert and Production Field Personnel.
- Drilling Expert and Drilling Field Personnel.
- Environmental Expert and Environmental site assessment.
Waste bins / skips constructed from steel plate with a hinged lid for disposal access. All hinged lids fitted with a designed mechanism that prevent the lid of the bin closing unexpectedly. All bins have identifier markings (colour or language) indicating waste stream use. (e.g. glass, metal, plastic etc.). Cubic Engineering is responsible for the unloading of all waste bins, Skip’s specifications
Capacity : 3 cubic meters (max).
Lifting points : 4 points.
Lid : 2 lids
Color coded : Yes
Available colors: Yellow, Green, Red, Black, Blue, Orange, Burgundy, Brown.