Project Description
Client:   Chevron
Location:   Rovi
Year Completed:   2013- 2016
Type: Water Solution & Waste Management

The Challenges
There are numerous challenges facing any project. Some are new to the industry, and some are centuries old. Many of these challenges are a direct result of operations, while others a result of indirect, peripheral activities. A surprising number of challenges are not construction issues but must be addressed and managed by Cubic engineering Co. to ensure project success.
Some of the construction/Operation issues include workforce considerations, safety, time constraints, and the changing nature of the work. Non-construction challenges that CE face that are part of the business landscape include legal issues, government regulations, environmental concerns, and socio-political pressures.Cubic Engineering used to overcome on this challenges always.

Project Description
Client:   Chevron
Location:   Sarta
Year Completed:   2013- 2016
Type: Water Solution & Waste Management

The Challenges
There are numerous challenges facing any project. Some are new to the industry, and some are centuries old. Many of these challenges are a direct result of operations, while others a result of indirect, peripheral activities. A surprising number of challenges are not construction issues but must be addressed and managed by Cubic engineering Co. to ensure project success.
Some of the construction/Operation issues include workforce considerations, safety, time constraints, and the changing nature of the work. Non-construction challenges that CE face that are part of the business landscape include legal issues, government regulations, environmental concerns, and socio-political pressures.Cubic Engineering used to overcome on this challenges always.

Project Description
Client:   TAQA
Location:   ATRUSH
Year Completed:   2013
Type: Water solution

The Challenges
There are numerous challenges facing any project. Some are new to the industry, and some are centuries old. Many of these challenges are a direct result of operations, while others a result of indirect, peripheral activities. A surprising number of challenges are not construction issues but must be addressed and managed by Cubic engineering Co. to ensure project success.

Some of the construction/Operation issues include workforce considerations, safety, time constraints, and the changing nature of the work. Non-construction challenges that CE face that are part of the business landscape include legal issues, government regulations, environmental concerns, and socio-political pressures.Cubic Engineering used to overcome on this challenges always.

Project Description
Client:   TAQA
Location:   ATRUSH
Year Completed:   2016
Type: Water solution


The Challenges
There are numerous challenges facing any project. Some are new to the industry, and some are centuries old. Many of these challenges are a direct result of operations, while others a result of indirect, peripheral activities. A surprising number of challenges are not construction issues but must be addressed and managed by Cubic engineering Co. to ensure project success.
Some of the construction/Operation issues include workforce considerations, safety, time constraints, and the changing nature of the work. Non-construction challenges that CE face that are part of the business landscape include legal issues, government regulations, environmental concerns, and socio-political pressures.Cubic Engineering used to overcome on this challenges always.

Project Description
Client:   TAQA
Location:   ATRUSH
Year Completed:   2016
Type: Water solution


The Challenges
There are numerous challenges facing any project. Some are new to the industry, and some are centuries old. Many of these challenges are a direct result of operations, while others a result of indirect, peripheral activities. A surprising number of challenges are not construction issues but must be addressed and managed by Cubic engineering Co. to ensure project success.
Some of the construction/Operation issues include workforce considerations, safety, time constraints, and the changing nature of the work. Non-construction challenges that CE face that are part of the business landscape include legal issues, government regulations, environmental concerns, and socio-political pressures.Cubic Engineering used to overcome on this challenges always.

Provide Various Sizes of Power Generators

Cubic Provides operation and maintenance services for most power generators types

SKIPLOADER Specifications
The equipment is designed to lift the containers are made according to DIN 30720 on its platform mounted on the chassis truck and transport. It also dumps the containers to discharge its content.

Design is made according to DIN 30723. Equipment consists of a platform, two loading arms, landing legs and hydraulic and pneumatic installation.

PLATFORM A
sub-frame with cross members is made to suit the chassis truck. Specially formed side members Enclose the platform. The landing legs at the rear end are connected to side members. Platform is made from checquered steel. There are side and front stoppers centering the container.

LIFTING ARMS
There are two robust lifting arms to lift the containers on the platform and to tilt them to discharge. Lifting arms are connected to each other to synchronize movement.

There are lubricated bronze bushing at rotating joints. There are chains on the lifting arms to lift the containers. Specially formed hooks are used to lift containers. There is pneumatically actuated hook to hold the containers during tipping.

LANDING LEGS
There are two landing legs at the rear of the equipment to provide the stability during the container lifting. Legs are controlled independently and functioned hydraulically.

HYDRAULIC AND PNEUMATIC INSTALLATION
Hydraulic gear pump is connected to PTO. PTO is controlled from the cab. When PTO is engaged, engine is accelerated automatically.

There is a lever controlled three spool hydraulic valve controlling two landing legs and lifting arms. there are four double acting hydraulic cylinders, two for the landing legs, the others for the lifting arms. hydraulic cylinders are made from honned tubes according to DIN 2391 C and chrome plated rods.

There are suction and return line filters, temperature and level indicators, breathing filling tap cover and ball valve on the hydraulic oil tank.

There is a dual over center valve on the hydraulic installation to provide proper working during container lifting and placing on the platform. All tubes are according to DIN 2391 C and the hoses are according to SAE 100 R2. Tipping hook is moved pneumatically with a double acting pneumatic cylinder and manually controlled by means of a two position pneumatic valve.

Construction projects:

Since 2007 the company got many contracts with Oil & Gas block operators in Kurdistan Region/Iraq. And implemented many important projects like:

Basrima preparation and pavement road for Marathon oil.

  • Site renovation, building the water pits, flare pits, and wastewater pits of Zeg for Oryx petroleum.
  • Constructing the water pits, flare pits, and wastewater pits of Banan1, Banan2, AAS1, and AAS2 for Oryx petroleum.
  • Constructing the water pits, flare pits, and wastewater pits of DD for Oryx petroleum.
  • 12 Schools renovation of Bassirma district for Marathon Oil.
  • Library and conference hall renovation of Bassirma district for Marathon Oil.
  • Design and construction of Pumping Stations of Harir-1 water supply facility for Marathon Oil.
  • Design and construction of Pumping Stations of Taza-1 water supply facility for Oil Search.
  • Design and construction of Pumping Stations of Safin-1 water supply facility for Marathon Oil.
  • Design and construction of Pumping Stations of Sarta-2 water supply facility for Chevron.
  • Design and construction of Pumping Stations of K3 water supply facility for Talisman Energy.
  • Design and construction of Pumping Stations of DD–3, 4, 5, 6, 7, 8, 9, 10, 11 water supply facilities for Oryx Petroleum (Norbest).
  • Design and construction of Pumping Stations of Zewe Water supply facility for Repsol.
  • Design and construction of Pumping Stations of Atrush 

And many other projects...

 

              Consultancy Services:

              We provide under these services mainly specialized and experienced personnel to assist and help our customers in their operations of exploration and production, the following are our main field of expertise:

                • Logistics Expert and Logistics Operations Personnel.

                • Production Expert and Production Field Personnel.

                • Drilling Expert and Drilling Field Personnel.

                • Environmental Expert and Environmental site assessment.

 

             Logistics & Procurement Services

                • All procurement services in General

                • Provide Vehicles & Equipment

                • Provide Tower Lights & related tools

                • Provide Power Generator& Transformers

                • Provide Transportation Services

                • Provide labor and rental equipment

 

 

Waste Management
Providing waste management and coordination services for the client operating locations.

Project Description
Provide all supervision, oversight, transport, security and administrative requirements for the performance of all activities.

Waste Storage Services
Provide waste storage facility/warehouse to storage the waste for short and long term with high quality standards

  1. Label all containers;
  2. Provide and maintain safety signs and fire extinguishers;
  3. Provide security, housekeeping and regular general and preventative maintenance,
  4. Provide spill prevention materials and spill clean-up services;
  5. Track, report, inventory and maintain all waste segregation inside the warehouse.


Reporting
Produce and supply regular reports to the client for all wastes received from the client operated locations.

Pages